Planned water supply maintenance is essential for improving the water supply infrastructure and customer experience. Tests and evaluations, as well as maintenance work, are conducted to proactively maintain and upgrade infrastructure, which secures future water supply continuity. While some pressure fluctuations and temporary water supply interruptions may occur, every effort will be made to keep them to a minimum. Residents impacted by these operations are advised to take note of the information and make the necessary arrangements.

What is the purpose of planned water supply maintenance?

Planned water supply maintenance is conducted to improve the water supply infrastructure and customer experience. It includes tests and evaluations such as zero-pressure tests and conditional assessments. Maintenance work is also carried out, including installing, repairing, and replacing pipes and valves. The goal is to proactively maintain and upgrade infrastructure to secure future water supply continuity. Although some pressure fluctuations may be experienced during this period, every effort will be made to keep these occurrences to a minimum.

A series of scheduled maintenance operations will be conducted by the City’s Water and Sanitation Directorate between the dates of February 19th and 23rd, 2024. The operations will affect several regions in terms of water supply. While these operations may cause some inconvenience, they are essential for improving the water supply infrastructure and, consequently, the customer experience. It is thus advised that residents of the impacted locations take note of this information and make the necessary arrangements.

Maintenance Operations and Affected Areas

In a systematic attempt to supervise and maintain the water supply network, comprehensive tests and evaluations will be executed over a few days. These will include zero-pressure tests (ZPTs) and conditional assessments. On Tuesday, February 20th, operations will commence at 10:00, lasting until 16:00, with Bellville South, Beroma, Glenhaven, Labiance, and Kasselsvlei areas being impacted. The following day, the operations will shift focus to Hout Bay Harbour, Hout Bay Heights, Hangberg, Bayview, and Hout Bay Central between 10:00 and 17:00. Lastly, on Friday, February 23rd, the Westlake Industrial area will be affected from 10:00 to 16:00.

The tests mentioned above are critical for the installation of pressure management technology, as they help reveal unidentified inflows that may need to be considered during the installation of intelligent pressure-reducing valves. During this operational period, some residents may experience reduced water pressure or temporary water supply interruptions. It is, however, impossible to forecast the exact streets or areas that will be affected by these disruptions.

Purpose and Impact of the Tests

These conditional tests are designed to ensure that the pressure-reducing valves (PRVs) in the water supply network are functioning at their best. This results in a longer pipeline lifespan and fewer pipe bursts, leading to less water wastage. Although some pressure fluctuations may be experienced during this period, every effort will be made to keep these occurrences to a minimum.

The implementation of these operations is fundamental to the City’s Water Demand Management Strategy. Effective pressure management not only prevents pipe bursts but also plays a significant role in reducing water wastage.

Scheduled Maintenance Work and Affected Areas

Alongside these tests, maintenance work will also be carried out, which will include installing, repairing, and replacing pipes and valves. The areas to be affected and the specifics of the operations are as follows:

On Tuesday, February 20th, three control valves on the water supply network will be replaced in parts of Hout Bay (Baviaanskloof and surrounding areas) between 09:00 and 17:00. The water supply will be temporarily shut down to ensure safe working conditions. Residents are encouraged to store sufficient water for household use.

At the same time, maintenance will be conducted on the Wemmershoek Water Treatment Plant, which will impact Bloekoembos, Wallacedene, Sandringham, Belmont Park, Klein Begin, Peerless Park, and Eikendal. Residents are requested to limit their water consumption from 07:00 until 15:00.

On Thursday, February 22nd, the maintenance crew will replace a 400mm diameter meter insert on the Brackenfell pipeline from 10:00 until 15:00 and a 150mm diameter control valve on the water supply main to Firgrove from 09:00 until 16:00. The water supply will be shut down in Firgrove during this period, and residents are advised to store enough water for household use.

The Importance of the Undertaking

This significant undertaking is a part of the Water and Sanitation Directorate’s strategy to proactively maintain and upgrade infrastructure, thereby securing the future continuity of the water supply. The City deeply regrets any inconvenience that these operations may cause.

Residents should note that larger-scale planned water supply disruptions like these are executed at the least disruptive times possible. All sites where these repairs and upgrades are performed will be out of bounds to the public for safety reasons. Additionally, the complex nature of this work may mean that the duration could be longer than anticipated. After the disruption, the water may appear discoloured or milky, but this will clear up if left to stand in a glass. For real-time updates on the maintenance work and the location of emergency water tankers, residents are encouraged to follow @CityofCTAlerts.

Residents are recommended to prepare for these planned water supply disruptions by storing enough water in clean, sealed containers and keeping their taps closed. By doing so, they can lessen the impact of these essential infrastructure maintenance works.

1. What is planned water supply maintenance?

Planned water supply maintenance is a series of tests, evaluations, and maintenance work conducted to proactively maintain and upgrade infrastructure, including installing, repairing, and replacing pipes and valves to improve the water supply infrastructure and customer experience.

2. Why is planned water supply maintenance important?

Planned water supply maintenance is essential for securing future water supply continuity, preventing pipe bursts, reducing water wastage, and improving the customer experience.

3. What areas will be affected by the planned water supply maintenance?

Several regions will be impacted by the planned water supply maintenance, including Bellville South, Beroma, Glenhaven, Labiance, Kasselsvlei, Hout Bay Harbour, Hout Bay Heights, Hangberg, Bayview, Hout Bay Central, and Westlake Industrial.

4. What are the specific maintenance operations that will be conducted?

The maintenance operations will include zero-pressure tests, conditional assessments, replacing control valves, and repairing and replacing pipes and valves.

5. How can residents prepare for the planned water supply maintenance?

Residents can prepare for the planned water supply maintenance by storing enough water in clean, sealed containers and keeping their taps closed. They are also encouraged to follow @CityofCTAlerts for real-time updates on the maintenance work and the location of emergency water tankers.

6. What should residents do during the planned water supply maintenance?

Residents impacted by the planned water supply maintenance are advised to take note of the information and make the necessary arrangements. They should also limit their water consumption during the scheduled maintenance work and store sufficient water for household use in case of temporary water supply interruptions.

Previous Story

The Global Phenomenon of Taylor Swift

Next Story

The Saga of Burnley FC’s Lyle Foster: A Story of Triumph, Tribulation, and Transformation

Latest from Blog

South Africa Takes a Giant Leap in the Global Fight Against Plastic Pollution

South Africa is making significant contributions to the global fight against plastic pollution by participating in the Intergovernmental Negotiating Committee’s fourth session (INC4) in Ottawa, Canada. With a deep understanding of the harmful impacts of plastic pollution on land, water, and marine ecosystems, South Africa is committed to implementing strategies that bolster waste management services, encourage recycling systems and raise public awareness through cleanup campaigns. The country’s negotiation strategy is fortified by its Constitution’s pledge to safeguard an unspoiled environment and protect it from plastic pollution.

Hailing the Triumph of the Traffic Fine Roadshow Campaign

The successful traffic fine roadshow campaign launched by the City’s Traffic Service has helped over 1,400 individuals resolve nearly 6,100 fines and clear 575 administrative marks. These roadshows, held throughout the year, provide an opportunity for drivers to address fines, charges, and warrants without the hassle of visiting multiple locations. The campaign promotes responsible behavior on the roads and has received positive recognition from the Safety and Security Portfolio Committee.

The Musical Transformation of Cape Town

Cape Town is gearing up for a unique musical festival this month, showcasing the transformative power of opera and classical music. As part of the ‘Opera in Your Neighbourhood’ community concerts initiative, the ‘Opera Blocks’ interactive play sessions for parents and children up to the age of five will foster cognitive and physical development. The initiative is a joint venture by the city, the Cape Philharmonic Orchestra, and the Cape Town Opera, aiming to bring the allure and sophistication of opera to local doorsteps and unite the city in a shared love for music.

Digital Forensics: Equipping the City’s Protectors with Tech-Savvy Expertise

The Safety and Security Directorate of the city recognizes the importance of integrating cyber forensics into their defensive strategy due to the increasing rate of digital offenses. To achieve this objective, they recently organized a transnational training session on cyber forensics led by professionals from France and Australia, focusing on digital aspects of crime scenes and handling digital proof. The Directorate plans to incorporate cyber forensics into their training college’s curriculum to prepare their personnel to tackle modern criminal activities effectively.

A New Chapter Begins: The End of E-tolls in Gauteng

The discontinuation of etolls in Gauteng marks a new chapter in South Africa’s history, with the government’s decision demonstrating its commitment to catering to the needs of its citizens. Etoll gantries will remain functional for road safety purposes, but road users need not worry about any immediate alterations. The termination of etolls heralds a new era of opportunities for SANRAL to pursue private funding for upcoming capital expenditure projects, augmenting the country’s road infrastructure.