South Africa faces an electricity crisis due to frequent power outages from coal power plant failures. The government’s proposed Integrated Resource Plan has been criticized for neglecting affordable renewable energy solutions, such as wind and solar power with increased storage capacity, and promoting gasintensive scenarios. The Lazard Levelized Costs of Energy report highlights the potential for renewable energy to drastically lower costs, but the government’s plan neglects this. Reconsideration is necessary to align proposals with environmental obligations and economic realities.