The Koeberg Sewer Pump Station is facing challenges due to sand and foreign debris intrusion, causing regular breakdowns and overflow. The city is addressing the issue by installing a sand trap and screening facility, increasing capacity, acquiring new pumps, and reassessing the berm design. A longterm improvement plan costing R118 million is projected to be completed by 2028. The city has also implemented temporary measures such as a dieseloperated mobile pump and a rising main to manage overflows during peak periods. The goal is to ensure efficient sewage management and protect the environmental health of the Milnerton Lagoon.
Cape Town residents urged to report sewer overflows The City of Cape Town is urging its residents to report sewer overflows immediately through official city channels such as WhatsApp and the City’s website. It is essential to report these incidents promptly during high, prolonged stages of loadshedding and heavy rain when sewer spills and overflows are more likely.
The City of Cape Town recently completed upgrades to the Koeberg Road and Langa sewer pump stations to protect the infrastructure from damage and reduce the risk of sewer overflows. The upgrades cost R2.36 million between both pump stations. ## New Filtration Screens